Massachusetts town profile
Berkley septic rules and Title 5 requirements
Berkley requires a completed Title V application and floor plan, BOH-agent witness, same-morning licensed pumping, and local repair/installer workflow.
Coverage note
TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.
Verified from public official sources ยท July 21, 2026
- Pumping and records
- Submit pumping record to local approving authority within 14 days of pumping under 310 CMR 15.351/15.502(7); confirm any local earlier or recurring requirement.
- Title 5 and inspections
- $150 application/inspection fee; inspector schedules with Health Agent; agent witnesses; tank pumped by licensed pumper on inspection morning; cesspools fail.
- Hauler permits
- Septage Permit Application is published; septic repairs require locally licensed installers.
- Published fees
- 2025โ26: Title V inspection $150; septic construction permit $400; plan review $225; repair callback $150.
- Filing workflow
- Mail or drop off Title V application, floor plan, and Town of Berkley check; schedule agent witness.
- Caveat or conflict
- Check current fee schedule and application version before submission.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Berkley Requirements for Title V Inspections โFree service-area packet
Put Berkley in your company report.
Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.
Scan my town bylaws freeContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.