Massachusetts town profile
Grafton septic rules and Title 5 requirements
Grafton publishes a 2025 Board of Health waiver form for an enforceable Title 5 compliance schedule when sewer connection or a compliant upgrade is pending.
Coverage note
TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.
Verified from public official sources · July 21, 2026
- Pumping and records
- 14 days after pumping (state Title 5 baseline; confirm any local variation).
- Title 5 and inspections
- Use the Board’s 310 CMR 15.305(1)(b) waiver/notice process only where applicable; it authorizes continued use until sewer connection or upgrade under the stated schedule.
- Hauler permits
- State law requires a Board of Health permit where septage is collected; confirm local conditions and renewal terms.
- Published fees
- Waiver fee not extracted.
- Filing workflow
- Submit the waiver/notice materials to Grafton Board of Health.
- Caveat or conflict
- Local rule, form, fee, permit, or operating workflow was identified; confirm current project-specific requirements with the Board of Health.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Grafton municipality-specific official Board of Health, septic, permit, or code source →Free service-area packet
Put Grafton in your company report.
Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.
Scan my town bylaws freeContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.