TANK/PROMassachusetts bylaw packet

Massachusetts town profile

Grafton septic rules and Title 5 requirements

local rules verified

Grafton publishes a 2025 Board of Health waiver form for an enforceable Title 5 compliance schedule when sewer connection or a compliant upgrade is pending.

Verified from public official sources · July 21, 2026

Pumping and records
14 days after pumping (state Title 5 baseline; confirm any local variation).
Title 5 and inspections
Use the Board’s 310 CMR 15.305(1)(b) waiver/notice process only where applicable; it authorizes continued use until sewer connection or upgrade under the stated schedule.
Hauler permits
State law requires a Board of Health permit where septage is collected; confirm local conditions and renewal terms.
Published fees
Waiver fee not extracted.
Filing workflow
Submit the waiver/notice materials to Grafton Board of Health.
Caveat or conflict
Local rule, form, fee, permit, or operating workflow was identified; confirm current project-specific requirements with the Board of Health.

Official source

Review the town material

TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.

Grafton municipality-specific official Board of Health, septic, permit, or code source →

Free bylaw packet

Add Grafton to your bylaw packet.

Choose every town your trucks serve. TankPro will email the published requirements and official links in one packet.

Build my free bylaw packet

Continue browsing

More verified town profiles

All towns →

TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.