Massachusetts town profile
Petersham septic rules and Title 5 requirements
Petersham BOH publishes local septic-system installation and annual installer/hauler fees, including soil-evaluation, plan-review, inspection, minor-repair, and Title V report-filing fees.
Coverage note
TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.
Verified from public official sources · July 21, 2026
- Pumping and records
- 14 days from pumping (state baseline)
- Title 5 and inspections
- State Title 5 baseline applies; consult the cited local or regional source for the municipal process.
- Hauler permits
- Installer and hauler annual permits are listed at $150.
- Published fees
- Soil evaluation $175; plan review $150; inspections $150 or two at $75; minor repair $100; Title V report filing $75; annual installer/hauler permit $150.
- Filing workflow
- Local channel not verified.
- Caveat or conflict
- Concrete municipal fee/workflow information verified; no fixed pumping deadline extracted.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Official Petersham Board of Health →Free service-area packet
Put Petersham in your company report.
Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.
Scan my town bylaws freeContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.