Massachusetts town profile
Russell septic rules and Title 5 requirements
Russell publishes Board of Health percolation-test and disposal-system-construction permit fees, as well as a septic-installer license application through its Health Inspector.
Verified from public official sources · July 21, 2026
- Pumping and records
- 14 days from pumping date (state baseline)
- Title 5 and inspections
- Perc-test application is required before scheduling; disposal-system construction application, plans, and fee must be submitted to Russell Town Hall.
- Hauler permits
- Not verified locally.
- Published fees
- $100 perc-test fee covers the first two hours, then $50/hour; $50 disposal-system-construction permit fee. Source states fees approved 2013-03-02.
- Filing workflow
- Submit applications, fees, and plans directly to Russell Town Hall, 65 Main Street.
- Caveat or conflict
- Fee sheet is dated 2013; confirm current fees before quoting or collecting.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Town of Russell Board of Health percolation test and disposal-system permit fees →Free bylaw packet
Add Russell to your bylaw packet.
Choose every town your trucks serve. TankPro will email the published requirements and official links in one packet.
Build my free bylaw packetContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.