TANK/PROMassachusetts bylaw scan

Massachusetts town profile

Wales septic rules and Title 5 requirements

local rules verified

Wales requires pre-work BOH plan review and approval, permitted installers, staged inspections, certified as-builts, and BOH certificate of compliance.

Coverage note

TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.

Verified from public official sources · July 21, 2026

Pumping and records
14 days from pumping date (state baseline).
Title 5 and inspections
Plan approval may take up to 45 days. BOH/agent performs sub-grade and pre-backfill inspections; engineer certifies pump/final grading; COC follows approved as-built and certification.
Hauler permits
Town publishes a septage-hauler permit application; confirm current permit terms.
Published fees
Town publishes BOH fee schedule; amounts not extracted in this pass.
Filing workflow
File plan with Wales BOH before install/repair/upgrade; obtain application at BOH office.
Caveat or conflict
Confirm fee schedule and permitting form revisions with BOH.

Official source

Review the town material

TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.

Wales Septic Information →

Free service-area packet

Put Wales in your company report.

Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.

Scan my town bylaws free

Continue browsing

More verified town profiles

All towns →

TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.