Massachusetts town profile
Wrentham septic rules and Title 5 requirements
Wrentham requires Board permits for septic construction and component repairs, provides online application, and specifies plan copies and local fees.
Coverage note
TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.
Verified from public official sources · July 21, 2026
- Pumping and records
- State Title 5: submit the pumping record to the local approving authority within 14 days of pumping.
- Title 5 and inspections
- For new/upgraded systems, licensed engineer submits four complete paper plan copies with soil analysis, forms, and fees; Board approves, seeks revisions, or rejects. Component repair needs Board permit; Board approval follows repair for Certificate of Compliance.
- Hauler permits
- State Title 5 requires a Board of Health permit where septage is collected; permit expires each calendar year unless a local rule provides otherwise.
- Published fees
- Septic construction permit starts at $420 and varies by design; component-repair permit is $105.
- Filing workflow
- Apply online and submit four paper plan copies for construction; apply online for component repair.
- Caveat or conflict
- Confirm the current complete fee schedule, inspection dates, and Title 5-report routing with the Board.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Wrentham official Board of Health or municipal source →Free service-area packet
Put Wrentham in your company report.
Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.
Scan my town bylaws freeContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.