TANK/PROMassachusetts bylaw scan

Massachusetts town profile

Falmouth septic rules and Title 5 requirements

local rules verified

Falmouth’s Board of Health adopted FHR 15.15, a local Title 5 supplement requiring nitrogen-reducing technology for specified new construction in Nitrogen Sensitive Areas.

Coverage note

TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.

Verified from public official sources · July 21, 2026

Pumping and records
14 days after pumping (state Title 5 baseline; confirm any local variation).
Title 5 and inspections
For specified new construction in Nitrogen Sensitive Areas, install qualifying nitrogen-reducing technology (10 mg/L total nitrogen or less). Falmouth PermitEyes accepts disposal-works permits, installer/pumper licenses, perc-test witnessing, and Title 5 reports.
Hauler permits
Apply through PermitEyes for a local Pumper & Hauler License.
Published fees
Published fees: $150 residential disposal permit, $100 septic pumper permit, $100 installer permit, $50 I/A operator permit, and $100 percolation test.
Filing workflow
Submit and view applications through Falmouth PermitEyes.
Caveat or conflict
Local rule, form, fee, permit, or operating workflow was identified; confirm current project-specific requirements with the Board of Health.

Official source

Review the town material

TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.

Falmouth Board of Health Septic Systems →

Free service-area packet

Put Falmouth in your company report.

Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.

Scan my town bylaws free

Continue browsing

More verified town profiles

All towns →

TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.