TANK/PROMassachusetts bylaw scan

Massachusetts town profile

Freetown septic rules and Title 5 requirements

local rules verified

Freetown’s published Board of Health regulations require Board licensing for subsurface-sewage-disposal installers and a $5,000 annual performance bond before licensure.

Coverage note

TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.

Verified from public official sources · July 21, 2026

Pumping and records
14 days after pumping (state Title 5 baseline; confirm any local variation).
Title 5 and inspections
A percolation-test report must be submitted to the Board for approval before the listed construction permit; local regulations also govern disposal-works installation.
Hauler permits
The published regulations include septage-waste pumping and transportation provisions; current terms were not fully extracted.
Published fees
Not extracted.
Filing workflow
Submit percolation-test material and permit/licensing requests to Freetown Board of Health.
Caveat or conflict
Local rule, form, fee, permit, or operating workflow was identified; confirm current project-specific requirements with the Board of Health.

Official source

Review the town material

TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.

Freetown Board of Health Regulations →

Free service-area packet

Put Freetown in your company report.

Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.

Scan my town bylaws free

Continue browsing

More verified town profiles

All towns →

TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.