Massachusetts town profile
Freetown septic rules and Title 5 requirements
Freetown’s published Board of Health regulations require Board licensing for subsurface-sewage-disposal installers and a $5,000 annual performance bond before licensure.
Verified from public official sources · July 21, 2026
- Pumping and records
- 14 days after pumping (state Title 5 baseline; confirm any local variation).
- Title 5 and inspections
- A percolation-test report must be submitted to the Board for approval before the listed construction permit; local regulations also govern disposal-works installation.
- Hauler permits
- The published regulations include septage-waste pumping and transportation provisions; current terms were not fully extracted.
- Published fees
- Not extracted.
- Filing workflow
- Submit percolation-test material and permit/licensing requests to Freetown Board of Health.
- Caveat or conflict
- Local rule, form, fee, permit, or operating workflow was identified; confirm current project-specific requirements with the Board of Health.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Freetown Board of Health Regulations →Free bylaw packet
Add Freetown to your bylaw packet.
Choose every town your trucks serve. TankPro will email the published requirements and official links in one packet.
Build my free bylaw packetContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.