Massachusetts town profile
Swansea septic rules and Title 5 requirements
Swansea's codified Conservation Commission plan guidelines impose a septic-system condition for certain new systems: the leaching field/drainage area must be more than 100 feet from a defined wetland, resource, or jurisdictional area.
Coverage note
TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.
Verified from public official sources ยท July 21, 2026
- Pumping and records
- 14 days from pumping date (state baseline)
- Title 5 and inspections
- Local conservation review guidance applies to septic plans in the stated circumstances; confirm Board of Health Title 5 workflow separately.
- Hauler permits
- Not verified locally.
- Published fees
- Not verified locally.
- Filing workflow
- Apply local Conservation Commission plan standards where applicable; confirm Board of Health submission process.
- Caveat or conflict
- This is a Conservation Commission septic-plan standard, not a complete local Title 5 or hauler-rule inventory.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Town of Swansea Code โ Conservation Commission plan guidelines โFree service-area packet
Put Swansea in your company report.
Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.
Scan my town bylaws freeContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.