Massachusetts town profile
Tisbury septic rules and Title 5 requirements
Tisbury requires pumper contact with BOH for a permit, requires Title 5 inspection after more than four pumpings/year, overflow/failure signs, or increased flow, and has local bedroom-density constraints in protected areas.
Coverage note
TankPro found a published local rule, form, fee, permit, or workflow in the cited official source.
Verified from public official sources · July 21, 2026
- Pumping and records
- 14 days from pumping date (state baseline)
- Title 5 and inspections
- State inspector sends results within 30 days; town accepts report for two years.
- Hauler permits
- Pumper contacts BOH to obtain pumpout permit; septage is trucked off-island.
- Published fees
- Not verified locally.
- Filing workflow
- Confirm with local approving authority.
- Caveat or conflict
- Confirm pumpout permit fee and current filing method.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Tisbury Board of Health →Free service-area packet
Put Tisbury in your company report.
Select every town your trucks serve. TankPro will email the sourced requirements and official links in one packet.
Scan my town bylaws freeContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.