Massachusetts town profile
Tyringham septic rules and Title 5 requirements
Tyringham’s BOH rules require Title V-certified witnesses, advance scheduling, two-week filings for test/inspection materials, inspections before covering, and photographs of septic projects.
Verified from public official sources · July 21, 2026
- Pumping and records
- Reports/billing for Title V/local-rule work filed within two weeks of job; state pumping record baseline is 14 days.
- Title 5 and inspections
- All appointments through Town Office with 48-hour notice. Perc-test plot plan due within two weeks; BOH approval of applications/as-builts required; system cannot be covered until inspection.
- Hauler permits
- Not verified locally.
- Published fees
- Witnessing/inspection $45 per hour, paid onsite; outside-consultant fees may apply.
- Filing workflow
- Schedule and file through Tyringham Town Office/BOH.
- Caveat or conflict
- Confirm whether the 2007 rules have later amendments.
Official source
Review the town material
TankPro based this profile on the linked public source. Check it and confirm material decisions with the local Board of Health.
Tyringham Board of Health Rules & Regulations →Free bylaw packet
Add Tyringham to your bylaw packet.
Choose every town your trucks serve. TankPro will email the published requirements and official links in one packet.
Build my free bylaw packetContinue browsing
More verified town profiles
TankPro summarizes public official sources for operational planning. This is not legal advice. Municipal rules and procedures can change. Confirm material decisions with the local Board of Health.